Scandoil  

DONG Energy to build Westermost Rough offshore wind farm


Published Feb 1, 2013
[an error occurred while processing this directive]

Edit page New page Hide edit links

DONG Energy-2

DONG Energy has decided to build the offshore wind farm Westermost Rough in the North Sea on the British east coast. The construction will represent a total investment of approximately EUR 1 billion including the construction of the transmission assets. When the wind farm goes into operation, the transmission assets will be sold to an offshore transmission operator, as required by UK regulation.

Westermost Rough will consist of 35 turbines from Siemens Wind Power, each of 6.0 megawatt, with a total capacity of 210 megawatt. It will be able to supply CO2-free power corresponding to the annual power consumption of almost 210,000 British households.

“With the decision to build Westermost Rough, we expand our position as world leading in the development, construction and maintaining of offshore wind farms,” said Henrik Poulsen, CEO of DONG Energy.

Siemens 6.0 MW turbine has just been erected at our demonstration site Gunfleet Sands 3 and has already been tested at Test Centre Østerild and Test Centre Høvsøre in Denmark.

Tags: DONG Energy




Advertisment:

Add a Comment to this Article

Please be civil. Job and promotion will not be added into the comment page.

(Use Markdown for formatting.)

This question helps prevent spam:

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us
Stats

 

sitemap xml