Scandoil  

Simba Energy to commence seismic work at Kenya Block 2A


Published Apr 16, 2012
Simba Energy Inc.

Simba Energy Inc. has been notified by GeoDynamics Research S.R.L. (Italy) that on site reconnaissance of its 100 percent interest in Block 2A - Kenya is to commence in April. Crew and equipment is scheduled to arrive early May 2012 and we will begin an extensive program acquiring passive seismic survey data.

The scope of this survey covers 290 square miles (750 square kilometers) with 250 MPS (measuring points) on 1.24 miles (2 kilometers) spacing to identify, and evaluate areas with hydrocarbon potential on Simba's Block 2A.

"The planned survey covers a portion of both basins within Block 2A where the Company has already identified 2 exploration leads by re-working existing 2D seismic data. These existing exploration leads will receive the immediate focus along with any additional leads identified from ongoing 2D re-interpretation. The potential areas identified will be further evaluated by conventional seismic most likely 3D or 2D and/or gravity gradiometer prior to selecting a drill site," said James W. Dick, P Geol.

Tags: Simba Energy Inc.




   

Add a Comment to this Article

Please be civil. Job and promotion will not be added into the comment page.

(Use Markdown for formatting.)

This question helps prevent spam:

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us

 

sitemap xml