Scandoil  

Work-over rig due at SWDF


Published Jun 21, 2012
[an error occurred while processing this directive]

Edit page New page Hide edit links

Imperial Resources, Inc.

Imperial Resources, Inc. and its wholly owned subsidiary, Imperial Oil & Gas, Inc. report that a work-over rig is due on site on June 20, 2012 at its largely rebuilt Green Tide Salt Water Disposal Facility (‘SWDF’).

The rig will undertake planned minor remedial work on the disposal well tubing and packer during the course of the next few days. Once this work has been completed, the wellbore will be connected to the SWDF plant in preparation for disposal testing.

Over the coming days in parallel with the above work a crew will set the pump stands in concrete in preparation for installation of the reconditioned and salvaged pumps. Installation of the pumps will begin as soon as possible thereafter. Final fibreglass repair work to the tanks is also scheduled to be completed at the same time. Electrical conduit has now been run to all tanks and programming of the pump control sensors and control system is in its final stages, installation being expected shortly.

Tags: Imperial Resources




Advertisment:

Add a Comment to this Article

Please be civil. Job and promotion will not be added into the comment page.

(Use Markdown for formatting.)

This question helps prevent spam:

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us

 

sitemap xml