Sound Oil has formally applied to the Italian authorities for the San Lorenzo Production Concession, with the target to develop and produce the Casa Tiberi gas discovery.
The proposed development plan contemplates an initial gas production phase followed by the generation of electricity for the local network. Once awarded the first phase of development requires the fast-track installation of a processing plant which will utilise a number of the Marciano production facilities.
The gas will be exported to the local grid network with a connection to the low pressure (4 bar) flowline located close to the site. Overall the phased development is designed to maximise the recovery of gas reserves.
Tags:
Sound Oil plc
Add a Comment to this Article
Please be civil. Job and promotion will not be added into the comment page.