Scandinavian Oil-Gas Magazine

http://www.scandoil.com/moxie-bm2/news/africa-hydrocarbons-reaches-td-on-bhn-1-well-in-tu.shtml

Africa Hydrocarbons reaches TD on BHN-1 well in Tunisia

Africa Hydrocarbons Inc. says that a total depth of 2745 metres has been reached at the Company's BHN-1 exploration well on the Bouhajla

[an error occurred while processing this directive]

Edit page New page Hide edit links

Africa Hydrocarbons Inc

Africa Hydrocarbons Inc. says that a total depth of 2745 metres has been reached at the Company's BHN-1 exploration well on the Bouhajla Permit in Tunisia. Preparation to run wire-line logs is underway. The well has penetrated 247 metres of upper Abiod formation, the main target zone in the well.

The BHN-1 well was spud on June 8, 2013 and is the first exploration well on the Bouhajla Permit. It is being drilled to evaluate a Cretaceous Abiod oil target on the Bouhajla North prospect.

Tags: Africa Hydrocarbons Inc.