Alexander Energy Ltd. announces that a workover/recompletion on the upper Detrital sand at 11-12-56-27W4 tested oil at over 260 bbls/day (net 244 bbls/day).
The well had been producing at the rate of 80 bopd from a middle Detrital sand and the workover involved isolating the middle sand, perforating the upper sand, and testing the production from the upper sand exclusively. The well is currently shut in to obtain pressure data and will be back on production within a week. The combined production from both the upper and middle zones should return the well to the maximum allowable production level of 125 bopd (118 bopd net).
With the success on this workover, Alexander is analyzing the possibility of additional workovers on two neighboring wells.
Tags:
Alexander Energy Ltd.
Add a Comment to this Article
Please be civil. Job and promotion will not be added into the comment page.