Scandoil  

American Eagle reports drilling of new well in Hardy field


Published Feb 1, 2012
[an error occurred while processing this directive]

Edit page New page Hide edit links

American Eagle Energy

American Eagle Energy Corporation and its partner, Passport Energy Ltd, report the drilling and casing of the second horizontal development well in the Hardy Bakken Field.

The Hardy Hz 3D14-17-3A3-17-4-21 (Hardy 14-17) was drilled to a total measured depth of 3,358 m (11,015 ft) with a lateral section of approximately 1,280 m (4,200 ft). A 26-stage fracture stimulation planned for the completion is scheduled for late February pending availability of the service crew.

American Eagle has received license approval for another well, the Hardy Hz 3D14-5-3A3-5-4-21 (Hardy 14-5), located approximately two miles south of the newly drilled well. Two additional well license applications are being prepared for submittal within the next 30 days.

The two existing wells in the Hardy Bakken Field continue to produce at stable rates with total gross production averaging approximately 160 bopd.

"We are pleased to have been able to capture the opportunity to accelerate our 2012 development plans by getting another of our planned wells drilled early in the year," stated Brad Colby, American Eagle's President. "Our team had the location permitted and built, which allowed us to take advantage of a rig window that was presented to us on short notice," Mr. Colby continued.

Tags: American Eagle Energy




Advertisment:

Add a Comment to this Article

Please be civil. Job and promotion will not be added into the comment page.

(Use Markdown for formatting.)

This question helps prevent spam:

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us

 

sitemap xml