AED's Cremer 1-1 well is the second of a series of wells planned on the prospect and located approximately one mile North-Northwest of AED's successful Brown 2-12 well. By utilizing the latest geological and geophysical technology, including the company's 19.23 square miles (12,300 acres) of high-resolution 3-D seismic data, AED has been able to build detailed analysis of the potential reef structure, to target areas of highest porosity with the best potential for recoverable reserves.
Data suggests the Cremer 1-1 reef structure is comparable in pinnacle height to the company's first drilled well, Brown 2-12, which was drilled on the Brown-12 reef structure. AED will apply the knowledge gleaned from the drilling of the Brown 2-12 to developing Cremer 1-1, while again using proprietary drilling techniques. The operator has contracted a conventional rotary drilling rig from a service provider under a turn-key contract, which includes the drill bits, blow-out preventers, surface casing, fuel, well supervision and engineering.
Tags:
American Energy Development Corp.
Add a Comment to this Article
Please be civil. Job and promotion will not be added into the comment page.