Scandinavian Oil-Gas Magazinehttp://www.scandoil.com/moxie-bm2/news/ascent-completes-pen-105-test-in-hungary.shtmlAscent completes PEN-105 test in HungaryAscent Resources, through its Hungarian subsidiary PetroHungaria Kft, has completed the testing of the PEN-105 gas well in the Nyírség permits of Eastern Hungary.
[an error occurred while processing this directive]
Edit page New page Hide edit links Ascent Resources, through its Hungarian subsidiary PetroHungaria Kft, has completed the testing of the PEN-105 gas well in the Nyírség permits of Eastern Hungary. The gas rates achieved and the reserves associated with this appraisal well were substantially higher than pre-drill estimates. The PEN-105 well, an appraisal of the PEN-12 discovery, was drilled to a total depth of 1,487m and has now been completed in the tuffaceous Miocene reservoirs as a production well. Environmental permitting of the pipeline that will be used to bring the gas to market is complete and construction is planned so that gas sales from this well can commence early in 2010. The productive reservoir found at the PEN-105 location is substantially thicker than at the PEN-12 discovery well, which should translate into a significant increase in anticipated reserves for the structure. The higher than expected flow rates are attributed to the use of state-of-the-art drilling mud and perforation technology. The PEN-105 well is located some 6 kilometres west south west of the PEN-104A gas production well in which Ascent has a 45.23% interest. Other partners in the project include DualEx Energy (37.5%), Geomega (8%), Leni Gas & Oil (7.27%) and Swede Resources (2%). |