Scandoil.com

AuDAX selects Sidi Daher prospect as first drilling target


Published Dec 14, 2009
[an error occurred while processing this directive]

Edit page New page Hide edit links

AuDAX Resources

AuDAX says that the multi target Sidi Daher prospect in the Chorbane Block has been selected as the first drilling target for onshore Tunisia. Detailed evaluation work by AuDAX since the signing of the PSC with the Tunisian Government has identified a Direct Hydrocarbon Indicator (DHI) over the large Sidi Daher prospect.

The Sidi Daher prospect is a large tilted horst block with several prospective reservoir targets. These reservoir targets are already producing in nearby oil and gas fields to the east and north east of the permit. The maximum mapped depth closure at the Eocene Metlaoui - El Gueria reservoir is 73 sqkm. Similar size closures also exist at other prospective reservoirs such as the Upper Cretaceous Abiod down to the Jurassic Nara formation. Of particular interest in Sidi Daher is the relatively shallow Eocene Metlaoui - El Gueria reservoir which is supported by a seismic response known in the industry as a DHI (Direct Hydrocarbon Indicator).

The particular seismic response seen is a flat spot which is caused by a fluid interface such as gas on water or gas on oil or light oil on water. The DHI is conformable with depth closure and can be very clearly seen on a total of seven seismic lines. Whilst the total closure at Metlaoui reservoir level is 73 sqkm, the DHI flatspot area encompasses around 16 sqkm. In a conservative scenario the nummulitic Metlaoui / El Gueria reservoir is a gas only accumulation within the bounds of the DHI. In such a case a total of 175 bcf of recoverable gas resource can be expected (Mean case). In a more optimistic scenario the structural closure of Sidi Daher would support a gas cap on an oil rim. In this scenario the oil rim would most likely contain (mean case) 54 mmbls of recoverable oil in addition to the gas cap resource. The well will also be testing the deeper prospective reservoirs of Upper Cretaceous age such as the Abiod. At this level the mean prospective recoverable resources are estimated to be 44 mmbls of oil.

Paul Fink, AuDAX Technical Director believes that the seismic DHI has significantly reduced the risk on the Sidi Daher prospect, including reservoir quality risk, since such clear DHI's only develop in good porosity reservoirs. Nearby wells have indeed encountered and confirmed excellent reservoir. In addition a discovery at the deeper Abiod and Nara reservoir levels would now be more likely, since trap integrity and migration risk is mitigated.

AuDAX' Managing Director Dr. Wolfgang Zimmer said, “'With this very encouraging outcome, I am keen to bring the drilling of Sidi Daher forward to the first possible opportunity. The Sidi Daher area is easy to access via existing roads and located near pipeline infrastructure and producing fields. This multi - target prospect with its large upside potential for both oil and gas and a relatively moderate risk is now another potential company maker in our portfolio”.

Tags: AuDAX Resources




   

Add a Comment to this Article

Please be civil. Job and promotion will not be added into the comment page.

(Use Markdown for formatting.)

This question helps prevent spam:

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us

 

sitemap xml


 

Home