Scandoil  

Pioneering Prelude FLNG project initiated at Drydocks World


Published May 24, 2012
[an error occurred while processing this directive]

Edit page New page Hide edit links

Prelude FLNG Turret

Drydocks World reported that Shell’s pioneering Prelude Floating Liquefied Natural Gas (FLNG) facility – the world’s first – was initiated with a Steel Cutting ceremony of its Turret, the world’s largest – at more than 90 m in height and 30 m in diameter and weighing 11,500 tonnes. The Ceremony was attended by senior personnel from Shell, Technip, SHI and SBM Offshore.

The Turret will be built as six modules at the Dubai shipyard and shipped to Samsung Heavy Industry's yard in Korea, where these will be integrated into the FLNG facility, once it is built. Drydocks World had earlier been awarded the Turret building contract by SBM Offshore as part of its contract with Technip for the engineering, procurement and construction (EPC) of the FLNG Turret Mooring System.

Once constructed the FLNG facility will be towed to location where it will be permanently moored in 250m-deep water through the turret, providing weathervaning capabilities, and a 4x4 mooring system. The FLNG facility and its mooring system have been designed to withstand extreme weather conditions including a Category 5 cyclone.

Tags: Drydocks World




Advertisment:

Add a Comment to this Article

Please be civil. Job and promotion will not be added into the comment page.

(Use Markdown for formatting.)

This question helps prevent spam:

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us

 

sitemap xml