Scandoil  

Cooper provides update on Butlers-4 well


Published Sep 20, 2011
Cooper Energy - PEL92

Cooper declared that Butlers-4 has been drilled to a total depth of 1,393 meters and wireline logs have confirmed that it has intersected a 7.5 meter oil column in excellent quality Namur sandstone reservoir, which is in line with pre-drill expectations.

The well has been cased and suspended, and the rig has been released. The well will be tied-back to the Butlers production facilities at a later date and will provide an additional drainage point for the Namur oil reservoir at the Butlers oil field. Together with Butlers-2 and Butlers-3, this well is expected to provide a significant increase to the Butlers oil field production rate.

The impact on production rates and reserves will be assessed once the full results of the current Butlers appraisal/development drilling program have been evaluated and production rates from the new development wells have been established.

Butlers-4 was the last well of the fifteen well 2011drilling campaign in PEL 92. The campaign included six successful appraisal/development wells on the Butlers and Parsons oil fields and three new field discoveries at Elliston-1, Germein-1 and Rincon-1, representing a 37% success rate for exploration wells in this drilling campaign.

Joint Venture Participants are Cooper Energy (25%) and Beach Energy (75% and Operator).

Tags: Cooper Energy




   

Add a Comment to this Article

Please be civil. Job and promotion will not be added into the comment page.

(Use Markdown for formatting.)

This question helps prevent spam:

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us

 

sitemap xml