Cooper declared that Butlers-4 has been drilled to a total depth of 1,393 meters and wireline logs have confirmed that it has intersected a 7.5 meter oil column in excellent quality Namur sandstone reservoir, which is in line with pre-drill expectations.
The well has been cased and suspended, and the rig has been released. The well will be tied-back to the Butlers production facilities at a later date and will provide an additional drainage point for the Namur oil reservoir at the Butlers oil field. Together with Butlers-2 and Butlers-3, this well is expected to provide a significant increase to the Butlers oil field production rate.
The impact on production rates and reserves will be assessed once the full results of the current Butlers appraisal/development drilling program have been evaluated and production rates from the new development wells have been established.
Butlers-4 was the last well of the fifteen well 2011drilling campaign in PEL 92. The campaign included six successful appraisal/development wells on the Butlers and Parsons oil fields and three new field discoveries at Elliston-1, Germein-1 and Rincon-1, representing a 37% success rate for exploration wells in this drilling campaign.
Joint Venture Participants are Cooper Energy (25%) and Beach Energy (75% and Operator).
Tags:
Cooper Energy
Add a Comment to this Article
Please be civil. Job and promotion will not be added into the comment page.