Scandoil  

Crown Point completes fifth well as a multizone oil well at El Valle


Published Jul 18, 2012
[an error occurred while processing this directive]

Edit page New page Hide edit links

Crown Point Ventures Ltd-2

Crown Point Ventures Ltd. report that the well to be drilled (EV 28) has been completed as a multizone oil well. Crown Point has successfully completed a total of 22 meters of pay in 6 different zones in the Mina el Carmen,

Caleta Olivia and Cañadon Seco formations. Each of the zones was swab tested for a minimum duration of 12 hours, all zones tested oil upon perforation at individual average rates ranging from 30 bbls to 143 bbls of oil per day.

A small scale fracture stimulation program, designed to get past near well bore formation damage and increase rates of inflow, will be carried out before the well is placed on production. Crown Point is currently swab testing the combined zones at a rate of 169 bbls/day of fluid with a 95% oil cut.

Tags: Crown Point Ventures Ltd




Advertisment:

Add a Comment to this Article

Please be civil. Job and promotion will not be added into the comment page.

(Use Markdown for formatting.)

This question helps prevent spam:

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us
Stats

 

sitemap xml