Scandinavian Oil-Gas Magazinehttp://www.scandoil.com/moxie-bm2/news/delek-energy-provides-update-on-the-drilling-at-le.shtmlDelek Energy provides update on the drilling at Leviathan 1 wellDelek Group subsidiaries Delek Energy Ltd., Delek Drilling L.P. and Avner Oil & Gas Exploration L.P. provides the following update.
[an error occurred while processing this directive]
Edit page New page Hide edit links Delek Group subsidiaries Delek Energy Ltd., Delek Drilling L.P. and Avner Oil & Gas Exploration L.P. provides the following update. In accordance with the business strategy and exploratory program of the Partners, following the agreement signed with Noble Energy Mediterranean Ltd. (hereinafter: “Noble”) in 2009, for the rental of the Sedco Express drilling rig, following to the seismic research conducted from 2009, and following the immediate report dated June 3, 2010, on August 26, 2010 a meeting was held between the partners of the Ratio- Yam Licenses (Rachel, Amit, Hannah, David, and Eran). During the meeting, the operator of the licenses, Noble, presented the partners with a final budget and plan for drilling the first exploration well on the "Leviathan" Prospect, which is located in the Rachel and Amit Licenses. The partners endorsed the plan and budget as described below. Drilling of "Leviathan 1" is planned on the Rachel License, about 135 km west of Haifa in a water depth of about 1,634 meters. Drilling is planned to 3 targets as follows: A. The main target – Prospect NG10 The main objective in drilling "Leviathan 1" is a gas target located in Tertiary - Oligocene age sands (the equivalent sand layer identified during the drilling of the Tamar well called NG10) to a depth of about 5,095 meters (including water depth). As previously reported, Noble estimates, based on seismic information in its possession, that the Gross Unrisked Mean Resource potential of natural gas in the NG10 prospect is about 16 TCF (about 453 BCM). This estimate does not account for the geologic probability of the existence of hydrocarbons in this prospect (Pg), which is estimated to be 50%. B. Secondary objectives – Leviathan Deep Prospects Targets After completing electric logs and other evaluations on the NG10 interval in the well, the drilling will be deepened for the purposes of collecting and testing of engineering and geological information, for the secondary goals which are listed below. It should be emphasized that the current information is significantly less than that which exists for the prospect NG10, and therefore very difficult to assess whether these targets may contain oil and/or gas and what would be their corresponding resource potential of the hydrocarbons in the prospect, and the probability of their existence. Based on the above it is stressed that it is highly unlikely that commercial quantities of oil and/or gas will be found.
In light of the above, or due to other technical considerations, the drilling rig may be replaced during the drilling of the deeper section with the Pride North America, which would continue to carry out the drilling operations. The Sedco Express drilling rig is expected to complete drilling for the Tamar development after it finishes drilling “Leviathan 1”. It should be noted that in the event the Early Cretaceous layers are lower than anticipated or due to other drilling difficulties, it may be impossible to complete drilling the deeper targets using either of these rigs due to their technical limitations. |