Dragon Oil plc published the results of completion and initial testing for three development wells and an updated rate for the 28/169 well in the Dzheitune (Lam) field.
The Dzheitune (Lam) C/170 well was completed as a dual producer to a depth of 8,957 feet (2,730 meters). The well tested for initial production at 2,072 barrels of oil per day ("bopd"). The drilling rig has skidded to the next slot and spudded the Dzheitune (Lam) C/173 well.
The Dzheitune (Lam) 13/171 is under completion testing and evaluation; further rigless optimization will be performed on the well. At the moment the well is yielding limited production. The drilling rig has been moved to the Dzheitune (Lam) 13/144 existing well to perform a sidetrack.