Scandoil  

Sound Oil reports drilling operations at Citarum PSC


Published May 29, 2012
Sound Oil enters production sharing contract in Indonesia

Sound Oil provides the following update on Citarum operations:

"The Jatayu-1 exploration well commenced drilling on February 15, 2012 towards a primary reservoir objective target depth of 7,382 feet. At 6,156 a drilling break occurred where the penetration rate increased from 16'/hour to 54'/hour over a 50' interval while drilling through sands, suggesting porous sands.

Associated with this drilling break was an influx of gas (18% mud gas, above a background 0.8%) into the well bore that required an increase in mud weight and 2-3 hours to circulate the gas out of the mud system. Shortly thereafter the pipe became stuck. The well is currently being plugged back to the 9 5/8" casing shoe at 4,736' and will be drilled vertically from this location to avoid the issues associated with the initial directional/deviated hole in a complex fold belt environment. It is believed this will largely mitigate the difficulties experienced to date.

Tags: Sound Oil plc




   

Add a Comment to this Article

Please be civil. Job and promotion will not be added into the comment page.

(Use Markdown for formatting.)

This question helps prevent spam:

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us

 

sitemap xml