Scandinavian Oil-Gas Magazinehttp://www.scandoil.com/moxie-bm2/news/galilee-energy-to-commence-logging-operations-at-h.shtmlGalilee Energy to commence logging operations at Hoffer B 1 wellGalilee Energy Limited confirms that a 4-½' casing string has now been run and cemented over all of the potentially productive
[an error occurred while processing this directive]
Edit page New page Hide edit links Galilee Energy Limited confirms that a 4-½' casing string has now been run and cemented over all of the potentially productive intervals to a total depth ('TD') of 14,150 ft. The successful completion of this critical activity will now allow the Operator to demobilise the drilling rig and move forward with logging ahead of production testing and potentially commercial production. As previously announced, a number of very significant shows were observed during drilling both in the lower secondary targets, and also strong shows from sandstones developed in the primary target. A total of thirteen significant shows were recorded at multiple levels in the well, in the depth range 11,230 ft to 14,150 ft. |