Scandoil  

Ground breaking shallow water buoyant tower design and supply


Published May 3, 2012
[an error occurred while processing this directive]

Edit page New page Hide edit links

shallow water buoyant tower

GMC and Horton Wison Deepwater confirmed their Joint Venture established to design and supply innovative Buoyant Towers for shallow water fields. Kevin Chell CEO of the joint venture stated “The Buoyant Tower concept draws on the proven technology of the cellspar and the design provides multiple benefits for fields where other concepts would be problematic requiring high capital costs and expensive crane barges for installation. The buoyant tower can operate in water depths up to 700 feet and can be relocated allowing small marginal plays to be exploited in a cost effective manner. The design allows for hydrocarbon storage if needed, can eliminate separate shallow water drilling units and provides a high level of flexibility for the operator.”

First Project The benefits of the design were recognized and adopted by BPZ Energy for their new platform at the Corvina field offshore Peru. The tower is composed of four cylindrical cells and is connected to the seabed by a single suction pile which is integral to the hull structure. The tower and decks with the production equipment will be transported from the fabrication yard to Corvina on a submersible heavy lift ship. After upending, fixed and variable ballast will be pumped into the hull to provide stability for the platform.

Tags: Hoton Wison Deepwater




Advertisment:

Add a Comment to this Article

Please be civil. Job and promotion will not be added into the comment page.

(Use Markdown for formatting.)

This question helps prevent spam:

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us

 

sitemap xml