Scandinavian Oil-Gas Magazinehttp://www.scandoil.com/moxie-bm2/news/origin-energy-secures-rig-for-yolla-gas-field-dril.shtmlOrigin Energy secures rig for Yolla gas field drilling programOrigin Energy Limited, as operator of the BassGas Joint Venture, announced that Seadrill Australia Pte Ltd
[an error occurred while processing this directive]
Edit page New page Hide edit links Origin Energy Limited, as operator of the BassGas Joint Venture, announced that Seadrill Australia Pte Ltd (Seadrill) has been contracted to provide the drilling rig for the project's upcoming work program in Bass Strait's Yolla gas field. The West Telesto drilling rig is expected to be mobilised during the 2014/15 Australian summer to drill the Yolla-5 and Yolla-6 wells as part of the Yolla Mid Life Enhancement project's second stage. The West Telesto is a three-leg jack-up rig that will cantilever over the Yolla platform during the drilling campaign. |