Petro Matad says that the Davsan Tolgoi-7 ("DT-7") exploration well was spudded at 12:30 Mongolian time (5.30 a.m. BST) on 27 June 2011.
The DT-7 well is being drilled vertically to an estimated target depth of 1,800 metres. The well is being drilled by the Company's contractor, DQE International.
This well will test a portion of the Uvgan Gal paleovalley as well as part of the Lower Tsagaansav Formation. DT-7 is 2.3km south-southwest of DT-6 and 3.2km south-southeast of DT-2. The well will test the Davsan Tolgoi Mod Prospect with dual objectives in the Uppermost Tsagaantsav paleovalley system and the Lower Tsagaantsav sandstones.
Tags:
Petro Matad
Add a Comment to this Article
Please be civil. Job and promotion will not be added into the comment page.