Scandinavian Oil-Gas Magazinehttp://www.scandoil.com/moxie-bm2/news/rds-wins-contract-with-wood-group-mustang.shtmlRDS wins contract with Wood Group MustangRDS, the rig design and engineering company, has been awarded a contract by Wood Group Mustang to carry out pre-FEED work on
[an error occurred while processing this directive]
Edit page New page Hide edit links RDS, the rig design and engineering company, has been awarded a contract by Wood Group Mustang to carry out pre-FEED work on Statoil’s proposed Snorre C Tension Leg Platform (TLP) in the North Sea. The Snorre field, spanning blocks 34/4 and 34/7 in the Tampen area of the Norwegian North Sea, is located at a water depth between 300-350 metres and is operated by Statoil on behalf of the Snorre partners. The pre-FEED work will be undertaken by the RDS team in London who will carry out the full design of the drilling facilities on the TLP. |