Scandinavian Oil-Gas Magazinehttp://www.scandoil.com/moxie-bm2/news/sound-oil-reaches-next-casing-point-at-second-nerv.shtmlSound Oil reaches next casing point at second Nervesa wellSound Oil says that the second Nervesa well has now been drilled (through the Conglomerati del Montello formation to the top of the
[an error occurred while processing this directive]
Edit page New page Hide edit links Sound Oil says that the second Nervesa well has now been drilled (through the Conglomerati del Montello formation to the top of the Marne di San DonĂ formation) to the next casing point at a measured vertical depth of 1,295 metres. Operations are now in progress to install the 9 5/8' casing. The well is therefore now approximately 200 metres above the first reservoir objective. |