Scandoil  

TATNEFT is expanding technologies of dual production for small diameter wells


Published Apr 22, 2013
[an error occurred while processing this directive]

Edit page New page Hide edit links

OAO Tatneft

Professionals of TatNIPIneft have developed an installation for dual production in the small diameter wells. The unit is designed for dual operation of targets (layers) in the wells with a nominal wellbore diameter of 114 mm production casing. Dual production technology was earlier applied in wells with 146 and 168 mm production strings.

The need for a single-lift dual production is due to the fact that technologies of drilling small diameter wells are being the successfully implemented at JSC TATNEFT. 235 wells of this kind have been drilled in the Company as of the beginning of the year. There are multiple productive formations in many of them for each formation.

The unit has been designed for dual production of two packer separated targets (layers) with their optimal operating parameters, and provides for zonal isolation, lifting and allocation metering, as well as the achievement of design development rates.

Besides, as in case of the conventional single-lift installation, when the bottom-hole pressure of the upper target is higher than the pressure of the lower one, the products from the target with the lower bottom hole pressure enter the pump cylinder through the main pump suction valve, and the ones from the upper target - through the additional valve set below the pump cylinder.

Tags: TATNEFT




Advertisment:

Add a Comment to this Article

Please be civil. Job and promotion will not be added into the comment page.

(Use Markdown for formatting.)

This question helps prevent spam:

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us
Stats

 

sitemap xml