Scandoil.com

Tethys commences drilling on AKD02 appraisal well, Kazakhstan


Published Apr 2, 2010
[an error occurred while processing this directive]

Edit page New page Hide edit links

Tethys Petroleum starts gas production in Kazakhstan

Tethys Petroleum Limited has commenced drilling the AKD02 appraisal well in Kazakhstan.

The AKD02 appraisal well is the first appraisal well of the AKD01 (Doris) oil discovery that flowed at a rate of 6,800 barrels of oil per day ('bopd') and will provide valuable further information on the size of the new oil field. It is planned to drill at least two appraisal wells on the Doris oil discovery to evaluate and establish the size and potential of the discovery and also to provide the necessary data to obtain a production contract. These wells will be extensively evaluated with coring, detailed geophysical logging and testing. A further appraisal well may also be drilled if deemed necessary after evaluating the results of the first two wells.

Luka Chachibaia, Project Manager of the Company's Kazakh Oil Exploration Development Team, commented: "We are very pleased that we have commenced drilling on this important appraisal well on schedule. This well will go some way to assessing the full size of what we believe to be a substantial oil field and we look forward to the results in Mid 2010."

In addition Tethys plans to carry out a 3D seismic survey over the Doris discovery and shoot additional targeted 2D seismic lines to firm up further potential in the area. Four separate bids to carry out the seismic work have now been received and the contract will be awarded later this week with the seismic planned to commence late May/early June.

In addition to the Doris oil discovery Tethys has identified several other exploration prospects in the area which appear similar to Doris and now that a hydrocarbon system has been proven at the deeper levels the risk on these prospects is reduced significantly. The Company's ZJ70 rig 'Telesto' is fully rigged down and ready for transportation from the AKD01 location to a prospect located to the south-west (named 'Dione') to drill the AKD03 exploration well. Drilling is also planned on the "Daphne" exploration prospect further west. The AKD03 well is expected to commence operations in early May and is planned to target both the Cretaceous and Jurassic intervals where oil has been flowed in the Doris oil discovery, and also the deeper Triassic and Permo-Carboniferous intervals that have further potential. Further exploration drilling on the large surrounding Kul-Bas block is also planned.

Tags: Tethys Petroleum Limited




   

Comments

1 comment(s) on this page. Add your own comment below.

memud B stephen
Apr 13, 2010 13:02 [ 1 ]

with the help of 2D and 3D seimic in oil indusries help to interprete and understand the geological formtion so, this method give clear picture of the area.

Add a Comment to this Article

Please be civil. Job and promotion will not be added into the comment page.

(Use Markdown for formatting.)

This question helps prevent spam:

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us

 

sitemap xml


 

Home