Scandinavian Oil-Gas Magazinehttp://www.scandoil.com/moxie-bm2/news/vital-energy-prepares-two-horizontal-wells-for-pro.shtmlVital Energy prepares two horizontal wells for production, applies for two moreVital Energy Inc. announces the following status update: Pennant Area, S.W. Saskatchewan: The previously announced 2 horizontal well locations at
[an error occurred while processing this directive]
Edit page New page Hide edit links Vital Energy Inc. announces the following status update: Pennant Area, S.W. Saskatchewan: The previously announced 2 horizontal well locations at 2A8-15-3A2-15-18-17 W3M and 3D1-15-2D9-15-18-17 W3M have both been drilled, cased and are currently being equipped for production. Production rates will be announced after the wells have been on production for a minimum of 30 days. Based on the initial encouraging results obtained from the first 2 horizontal wells Vital has applied for 2 more horizontal well licenses on the Pennant project. The locations are Vital Battrum HZ 2A11-16-2A9-16-18-17W3M and Vital Battrum HZ 4D7-15-3B2-15-18-17W3M. |