Crimson Exploration Inc. reported the successful completion of the Payne #1H (92.1% WI), its sixth horizontal well targeting the Woodbine formation.
The Payne tested at a gross initial production rate of 1,332 Boepd, or 1,128 barrels of oil, 112 barrels of natural gas liquids and 554 mcf of natural gas, on a 40/64th choke and 328 psi of tubing pressure.
The well was drilled to a total measured depth of 16,130 feet, including a 7,460 foot lateral, and was completed using 26 stages of fracture stimulation.
Tags:
Crimson Exploration Inc.
Add a Comment to this Article
Please be civil. Job and promotion will not be added into the comment page.