Scandoil  

Silvermere Energy confirms further progress on production and sales of oil and gas


Published Mar 6, 2013
[an error occurred while processing this directive]

Edit page New page Hide edit links

Silvermere Energy

Silvermere Energy confirm further progress on production and sales of oil and gas during February 2013 from the I-1 well on its Mustang Island 818-L Field. This is based on information provided by the Operator, Dominion Production Company LLC (Dominion).

Total production and sales of gas recorded during the month were 11,477,000 standard cubic feet (scf), an increase of 32% month to month and total production of oil was 1,845 barrels, an increase of 4% month to month (1,912,068 scf and 308 barrels, respectively, net to Silvermere). The well was flowing for 73% of the time in February, representing a significant improvement on the previous month.

Flow rates were restricted at times due to partial obstruction of the choke with drilling mud and debris as the well clean-up continued. When unrestricted by mud and debris, the well flowed at typical values of 700,000 scfpd and 155 bopd with a tubing head pressure of 2700 psi, in line with previous guidance.

Tags: Silvermere Energy




Advertisment:

Add a Comment to this Article

Please be civil. Job and promotion will not be added into the comment page.

(Use Markdown for formatting.)

This question helps prevent spam:

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us
Stats

 

sitemap xml