Scandoil  

Tap Oil gets extension of Accra contract area


Published May 14, 2012
[an error occurred while processing this directive]

Edit page New page Hide edit links

Ghana Map Gulf of Guinea

Tap Oil Limited (Tap) report that the Ministry of Energy, Ghana has granted a 12 month extension of the Initial Exploration Period under the Petroleum Agreement in respect of the Offshore Accra Contract Area. The Initial Exploration Period now ends on 23 September 2013, by which date the commitment well must be drilled.

New 3D seismic was acquired over the deepwater part of the Contract Area in early 2011. Interpretation of the data at hand indicates multiple large prospects within both the post-rift Upper Cretaceous fan sands (the same play type as Jubilee) and pre-rift Lower Cretaceous rotated fault blocks (the same play type as the Espoir and Baobab oil fields). To date several prospects and leads have been mapped and have unrisked prospective resources of greater than 3 billion barrels.

Tags: Tap Oil Limited




Advertisment:

Add a Comment to this Article

Please be civil. Job and promotion will not be added into the comment page.

(Use Markdown for formatting.)

This question helps prevent spam:

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us

 

sitemap xml