Vanguard Energy Corporation has successfully drilled and completed three new oil wells on the Batson Dome Field in Southeast Texas. The new wells cost approximately $700,000 each and were drilled to a depth of approximately 3,000-4,000 feet.
Mr. Warren Dillard, President of Vanguard Energy, said, "We are very pleased with the initial results of this new drilling." The wells were financed with a portion of the proceeds from the Company's recently completed convertible note financing. The early production rates on the wells are on par with expectations and well above target production standards set by previous Batson Dome wells of approximately 20 barrels of oil per day per well.
Exact production rates will vary from well to well because of the nature of the field, which is highly fractured being on top of a salt dome. Also, the wells are producing from pay zones that are different in size and ultimate recovery rates. The company's wells are conventional, vertically drilled wells with no laterals and require no fracing. They produce oil only, no natural gas.
Tags:
Vanguard Energy Corporation
Add a Comment to this Article
Please be civil. Job and promotion will not be added into the comment page.