Ascent Resources plc says that the workover operations on the Anagni-1 well in the Frosinone Exploration Permit in the Latina Valley, Italy, have been completed and that testing is expected to recommence today.
The full potential of the well will not be known until large quantities of drilling fluids (drilling ‘mud’) that were lost into the reservoir formation while drilling are recovered.
These losses, which are characteristic of high permeability reservoirs in the region are due to the fractured nature of the rock and will enhance the productivity of the formation. So far an estimated 75% of the volume of the lost fluids has been recovered. Core analysis results are encouraging for the oil potential of the well and the downhole equipment which uses the same pump as before has been reconfigured to more efficiently reach a conclusive test result.
Ascent has an 80% interest in the Anagni-1 well.
Tags:
Ascent Resources plc
Add a Comment to this Article
Please be civil. Job and promotion will not be added into the comment page.