Scandoil.com

Brinker exceeds operator requirements with zero failures


Published May 4, 2010
[an error occurred while processing this directive]

Edit page New page Hide edit links

Brinker-2

UK based, oil and gas technology company Brinker is celebrating a year of zero failures as its game-changing Platelet® barrier technology redefines working practices in the global well integrity market.

It is estimated at any one moment in time across the world that between 20 - 30% of existing wells do not operate due to integrity issues. Brinker’s’ Platelet technology enables operators to bring shut-in wells or wells producing under dispensation back online in a matter of hours.

More than 30 workover jobs have been carried out in the last year from the Arctic ice cap to the deserts of the Middle East, in temperatures ranging from minus 40 degrees Celsius to plus 50 degrees Celsius - all completed with a 100 per cent success rate.

Demand for Brinker’s technology in North America has been such that the company recently set up an office in Houston, as it continues to grow its market share in the region.

Brinker has developed its unique Platelet® barrier technology, and its Telepath® leak location system to provide instant downhole rigless thru-wellhead workover services for simultaneously finding and fixing tubing and casing leaks in wells.

The company’s innovative Platelet technology - applied through the wellhead - eliminates delay, costs, risks and logistical issues associated with a rig workover. Unlike conventional methods, which can take many months, Platelets can restore full production capacity in a matter of hours, by finding and fixing leaks from the wellhead down.

It does this by deployment through the annulus or tubing of a well, enabling operators to bring shut in or under-producing wells back on line, or to full production, within hours rather than months in a cost-effective, efficient and safe solution.

Brinker chief executive officer, Kevin Stewart said: “With demand for oil increasing exponentially on a daily basis, our customers have been able to brings wells back online and fully utilise existing infrastructure to meet their production quotas.

“Our technology is clean, fast and we can get our customers back on line within hours. We have a product here that will radically change rigless thru-wellhead workover, which has never failed and can potentially bring the industry closer to matching demand with supply.

“We are completely rewriting the rules regarding the time it takes to fix and find leaks and previous assumptions about the viability of shut in wells. We are now enabling our customers to implement field-wide integrity programmes by bringing multiple wells back on line, in many cases, in just hours, which is unprecedented. A recent job saw us find and fix five wells in just four days with zero failure or disruption to the operator’s workflows.

“In the time it would take to plan one well workover, we can address well integrity issues across an entire field. That means rig deployment can be focused on workovers where they are really needed, or for drilling new wells.”

Tags: Brinker




   

Add a Comment to this Article

Please be civil. Job and promotion will not be added into the comment page.

(Use Markdown for formatting.)

This question helps prevent spam:

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us

 

sitemap xml


 

Home