Scandoil  

Caspian Energy and partners spud Kazakh well


Published Jul 22, 2011
[an error occurred while processing this directive]

Edit page New page Hide edit links

Caspian Energy

Caspian Energy and partners declared spudding of an exploration well between the two producing wells in the East Zhagabulak field of Kazakhstan.

The new well is the first step in a plan aimed at expanding the area held by the partners under a 25-year production licence, said Caspian Chairman and CEO William Ramsay. Ramsay said the well is one of six drilling targets approved July 8 by the Central Development Committee (CDC) of the Republic of Kazakhstan.

Well EZ #308 spud on July 16 and will take about 100 days to complete to about 4,700 meters, Ramsay said. It is targeting the same carboniferous structure of the Bashkirian layer from which the two earlier successful wells are currently producing about 400 barrels of oil per day.

All wells will be drilled under the direction of Aral Petroleum Capital, the operating entity in Kazakhstan, which is owned 40 per cent by Calgary-based Caspian and 60 per cent by Asia Sixth Energy of China.

Second target At the same time that EZ #308 began drilling, a second rig was en route to a location southwest of the East Zhagabulak field, an area officially designated Zhagabulak II and III and locally known as Sakramabas. This rig is expected to commence drilling the CDC-approved Sakramabas #316 well before the end of July.

"Our seismic analysis indicates the potential for a high-porosity carbonate reef at the Sakramabas #316 site," Ramsay said. Neighbors have drilled successful wells on surrounding leases and our 3-D seismic indicates our well is on the same trend line as those producing wells and we have more advantageous geological conditions for oil and gas accumulation than our neighbors."

"It's a new direction for us and a potential new resource base, arising out of the success of our neighbors and a consequent re-examination of our seismic data.

"This is a deep well, targeting the same well know carboniferous structure of the Bashkirian layer at some 4,500 meters," he said. "Again we expect drilling to take about 100 days to reach total depth, with testing to follow.

"By drilling two separate exploration plays, we're offsetting risk and enhancing potential," Ramsay said. "We have good confidence in both prospects, but they are exploration wells and they entail some level of risk."

Next steps Next steps in Aral's drilling plans will be governed by results at Sakramabas, Ramsay said. Success there may indicate the presence of a number of separate new oil and gas formations, from East Zhagabulak to Sakramabas. In the event of a good result at Sakramabas #316, the partners will complete the EZ #308 well and move that rig to a location northeast of Sakramabas, where it will test for oil between Sakramabas and East Zhagabulak. An additional drilling rig would then be contracted in October to pursue targets within East Zhagabulak.

Obtaining new geological data could prove regional distribution of oil and gas productive layers through all central parts of the Zhagabulak field and will enable Aral to apply for a production license on a greatly expanded area, Ramsay said.

"We would cross over into the new year with three rigs working full time to prove up the potential of the Zhagabulak field," he said.

Tags: Caspian Energy Inc.




Advertisment:

Add a Comment to this Article

Please be civil. Job and promotion will not be added into the comment page.

(Use Markdown for formatting.)

This question helps prevent spam:

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us

 

sitemap xml