Scandoil.com

Addax Petroleum announces results of continued appraisal drilling at Taq Taq


Published Mar 2, 2007
[an error occurred while processing this directive]

Edit page New page Hide edit links

Addax Petroleum Corporation announced flow test results for the TT-05 well, the second appraisal well recently drilled on the Taq Taq field by Taq Taq Operating Company (“TTOPCO”), the joint venture company formed by Genel Enerji A.Ş. (“Genel”) and Addax Petroleum to carry out the petroleum operations in the Taq Taq license area.

Two reservoir intervals were tested separately and flowed at an aggregate rate of 26,550 bbl/d of light oil, measured gravity ranging from 44 to 50 degrees API with low gas oil ratio. The intervals tested were a 105 meter perforated interval in the Shiranish formation which flowed at a rate of 12,890 bbl/d and a 82 meter interval in the Qamchuga formation which flowed at a rate of 13,660 bbl/d. Oil flow rates from the Shiranish and Qamchuga intervals were restricted by 56/64” and 64/64” choke sizes respectively, and in each instance, limited by the capacity of the surface testing facilities. Evaluation of these flow test results is ongoing.

Commenting, Jean Claude Gandur, President and Chief Executive Officer of Addax Petroleum said: "I am delighted at the continued successful appraisal of the Taq Taq field and the excellent cooperation amongst the Taq Taq field partners. I believe that this operational momentum, alongside the constructive efforts of the Kurdistan Region and Iraq towards finalising a legal framework, will expedite the development of the Taq Taq field. We believe that the development of the Taq Taq field can deliver excellent value to the people of the Kurdistan Region, to the people of Iraq and to our shareholders.”

The TT-05 well is located on the crest of the Taq Taq field and was drilled approximately 580 metres north-northeast of the TT-04 well. The TT-05 well was spudded in late October, 2006 and completed drilling in late December, 2006 at a total depth of 2,070 metres. Testing commenced in mid-February, 2007.

Interpretation of data acquired, including wireline and core data, confirm the presence of a significant and extensive fracture system as observed in the TT-04 well. The TT-05 well was the second of an initial three well drilling program by Genel and Addax Petroleum. The drilling of the third appraisal and development well, TT-06, is now in progress. The TT-06 well location is approximately 3.6 kilometres north-northwest of the TT-05 well.

The Taq Taq field is located in the Kurdistan Region of Iraq some 60 kilometres northeast of Kirkuk, 85 kilometres northeast of Erbil and 120 kilometres northwest of Sulaimaniyah.




   

Add a Comment to this Article

Please be civil. Job and promotion will not be added into the comment page.

(Use Markdown for formatting.)

This question helps prevent spam:

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us

 

sitemap xml


 

Home