Scandoil  

Desire Petroleum gets nod to drill 14/15-2 Rachel North well


Published Nov 10, 2010
[an error occurred while processing this directive]

Edit page New page Hide edit links

Desire Petroleum reports directorate change

Desire Petroleum says that both regulatory and partner approvals have been granted for Desire to drill the 14/15-2 Rachel North well.

The 14/15-1 well has been plugged and abandoned and the rig is currently waiting on weather to move to the Rachel North location.

The Rachel North well will be drilled vertically with an estimated total depth of 3,050 metres. The bottom hole location will be 1.7 kilometres from the Rachel sidetrack 14/15-1Z bottom hole location. Drilling operations are expected to last around 35 days.

It is intended that this well will evaluate the sands with oil shows encountered in the Rachel sidetrack as well as a number of possible additional sands not seen in the sidetrack.

Desire wishes to thank both the regulatory authorities and its partner Rockhopper Exploration plc for their speedy approvals to move to the new Rachel North location.

Tags: Desire Petroleum plc




Advertisment:

Add a Comment to this Article

Please be civil. Job and promotion will not be added into the comment page.

(Use Markdown for formatting.)

This question helps prevent spam:

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us

 

sitemap xml