DualEx Energy International reports the signing of the Bouhajla Production Sharing Contract (PSC) and associated documents in Tunis. The initial term of the PSC is three years from the date of ratification, which is expected prior to year-end, with two optional renewal periods of three years each.
The Company’s wholly-owned subsidiary, DualEx Tunisia Inc., has a 100% Contractor Interest in the Block with a work commitment consisting of a minimum of 100 kilometres of 2D seismic and one exploration well to test the Cretaceous Abiod formation during the initial term.
The Bouhajla Block encompasses 416 square kilometres (105,000 acres), and is located onshore in the Pelagian Basin of east central Tunisia. The Block lies immediately west of the Sidi el Kilani field, which has produced to date approximately 48 million barrels of light oil from the Abiod formation.
DualEx CEO, Garry Hides, said, “the Company is very excited to have been awarded the Bouhajla Block, which we feel holds considerable exploration potential, and we look forward to a long and rewarding presence in Tunisia.”
Tags:
DualEx Energy International
Add a Comment to this Article
Please be civil. Job and promotion will not be added into the comment page.