Scandoil.com

Empyrean provides updat on Sugarloaf project, block B


Published Mar 4, 2010
[an error occurred while processing this directive]

Edit page New page Hide edit links

Empyrean Energy - Sugarloaf project

Empyrean Energy provides the market with the following update of operations on Block B at the Sugarloaf Project:

Morgan-1H well Empyrean has been advised by the operator Hilcorp Energy that the second farm-in well within the Sugarloaf AMI, the Morgan-1H well, was spudded on Friday, February 26, 2010.

The well is located approximately 5 km North West of the Easley-1H well. The well design includes a vertical pilot hole prior to drilling a horizontal section that will access both the Austin Chalk and Eagle Ford horizons following fracture stimulation.

Easley-1H well On March 2, the operator was drilling ahead at a depth of 15,535 ft (MD) with approximately 2,800 ft of horizontal section now having been drilled within the reservoir. Elevated gas readings have been observed since penetrating the reservoir.

Kennedy-1H and Weston-1H wells Both wells continue to produce to sales in line with expectation. Production tubing has yet to be installed in either well and further updates on production rates will be provided once this has occurred and stable rates have been established

Tags: Empyrean Energy




   

Add a Comment to this Article

Please be civil. Job and promotion will not be added into the comment page.

(Use Markdown for formatting.)

This question helps prevent spam:

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us

 

sitemap xml


 

Home