Abraxas provides completes the Ribeye 1H and Ribeye 2HAug 6, 2014Abraxas Petroleum Corporation provide the following operational, production and guidance update. At Abraxas’ Jourdanton prospect in Atascosa County,
AWE starts drilling Senecio-3 appraisal well in the Perth BasinAug 6, 2014AWE Limited, as Operator of Permits L1/L2 in the Perth Basin, Western Australia, advises that the Senecio-3 appraisal well
Key Petroleum to complete rig maintenance next weekAug 6, 2014Key Petroleum Limited says that since Drilling Report on Dunnart-2 well in exploration permit EP437, Perth Basin, Western
Energy XXI declares fiscal year-end reserves estimatesAug 6, 2014Energy XXI provided estimates of its fiscal 2014 year-end reserves and fiscal 2015 capital program, as well as an operations
FX Energy selects a drill site for its third well in the Edge licenseAug 6, 2014FX Energy, Inc. has selected a drill site for its third well in the Edge license. The Company's two previous wells in the license,
Rose Petroleum completes MIT of casing in UtahAug 6, 2014Rose Petroleum has successfully conducted a Mechanical Integrity Test (MIT) of the casing in its State 16-42 Paradox well
Austin spuds Curington 'A' #1H well at Eagle Ford projectAug 5, 2014Austin Exploration’s Curington 'A' #1H well has been spud at the Company's Birch Eagle Ford Project in Burleson County, Texas.
Final Seismic Volume Report for 'La Bella' 3D seismic survey received on scheduleAug 5, 2014WHL Energy Limited says that the final Seismic Volume Report for the 'La Bella' 3D seismic survey has been received on
Real Energy to commence Cooper Basin drilling program in SeptemberAug 5, 2014Cooper Basin focused oil & gas exploration company Real Energy Corporation Limited ('Real') has signed a contract with
Gazprom Neft begins exploratory drilling in KurdistanAug 5, 2014Gazprom Neft has begun drilling an exploration well at the Shakal block in Kurdistan (Iraq) and is soon to commence drilling on
CAMAC Energy discovers multiple oil and gas reservoirsAug 5, 2014CAMAC Energy Inc. announce the preliminary results of a successful Oyo field development well offshore Nigeria in OML 120.
Arabella Exploration provides production update on its Emily Bell #1H wellAug 5, 2014Arabella Exploration, Inc. announced a Peak 30 Day Production Rate for its Emily Bell #1H of 482 BOE/Day.
CGG completes acquisition of Avalon 3D seismic survey in the Delaware BasinAug 5, 2014CGG has completed field acquisition of the 282 sq mile Avalon 3D seismic survey in Reeves and Loving Counties, Texas.
Premier Oil's second discovery boosts reserves on Tuna block offshore IndonesiaAug 4, 2014Premier Oil Plc's (Premier), latest exploration well offshore Indonesia has discovered wet gas reserves in the Singa Laut structure in the
Octagon 88 Resources ancompletes Bluesky Gething horizontal legAug 4, 2014Octagon 88 Resources Inc., (OCTX) says that since the company's last operation update the operator has moved forward with drilling
Sound Oil updates Nervesa long lead itemsAug 4, 2014Sound Oil updates investors on its continued progress with the proposed second well addressing the Southern limb of the Nervesa gas
3Legs Resources completes multi-stage stimulation for Lublewo LEP-1ST1H lateral wellAug 4, 20143Legs Resources has successfully completed the multi-stage stimulation for Lublewo LEP-1ST1H lateral well, as planned.
Junex tests 180 barrels of oil per day at its Galt No. 3 wellAug 4, 2014Junex Inc. has recovered 180 barrels of oil over a 24-hour period (or an "initial rate" of 180 barrels of oil per day) from a production test
FieldPoint completes the third and fourth horizontal Taylor Sand wellsAug 4, 2014Phillip Roberson, FieldPoint President and CFO, stated, "As the Ranger Project continues, we have now completed the third and fourth
Kea Petroleum drills Puka-3 appraisal well at a depth of 839mAug 1, 2014Kea Petroleum says that the Puka-3 appraisal well was drilling ahead at a depth of 839m, at 6:00am New Zealand time on 31 July
Global Energy Development updates the operations of the Catalina #1 Simiti formationAug 1, 2014Global Energy Development says that the Catalina 1 well was stimulated using 27,000 barrels of water pumped into the Simiti formation.
Matador Resources updates 24-hour initial potential test resultsAug 1, 2014Matador Resources Company announce the 24-hour initial potential test results of two of its most recent wells completed in the Permian
Northern Spirit Resources encouraged with the results from wells drilledAug 1, 2014Northern Spirit Resources Inc. has drilled, completed and tested 3 horizontal wells (WI 100%) at Klein North. The wells were drilled from
Circle Oil drills EMD-1 exploration well to 753 metres MDAug 1, 2014Circle Oil says that the EMD-1 exploration well, offshore Tunisia, was spud on 8 June 2014 and drilled to 753 metres MD after which the