Tower Resources updates drilling operations for the Welwitschia-1 wellMay 22, 2014Tower Resources plc provides an update on drilling operations for the Welwitschia-1 well. In summary, there has been a delay to the
North American Petroleum increases gas production at Zink Ranch ProjectMay 22, 2014North American Petroleum notes that Northcote Energy Ltd, its partner and operator of the 1,520 gross acre Zink Ranch Project
Petrobras confirms another discovery in the Santos Basin pre-saltMay 22, 2014Petrobras has completed the formation test on well 1-SPS-98 (1-BRSA-1063-SPS), informally known as Sagitário, located in ultra-deep
Touchstone Exploration provides operational updateMay 22, 2014Touchstone Exploration Inc. provide an operational update following the closure of the previously announced combination of Petrobank
Oryx Petroleum provides drilling update for Demir Dagh in Kurdistan Region of IraqMay 21, 2014Oryx Petroleum Corporation Limited announces the test results for the Demir Dagh-3 well (DD-3) and Demir Dagh-5 well (DD-5)
Bengal Energy reports significant increases in year end fiscal 2014 reserves and valueMay 21, 2014Bengal Energy Ltd. announce significant increases in the net present value and volume of its reserves following the completion of its
Emerald Bay announces new field discovery at Wooden HorseMay 21, 2014Emerald Bay Energy Inc. provide an update on recent activities in Texas. At Wooden Horse, the Company recently completed the Kuhn 2 vertical well in
Trinity's B-9X has been drilled to a depth of 4,944 ft-MDMay 21, 2014Trinity provides an update on the B-9X infill well drilled at the Trintes Field on the Galeota license. B-9X has been drilled to a depth of 4,944 ft-MD,
Tethys on track for a 15 year extension to Kyzyloi gas contractMay 21, 2014Tethys Petroleum Limited announced that the Kazakh State Reserves Committee (GKZ) has approved the Company's gas reserve
Production from Snorre B template shut downMay 21, 2014Production from a subsea template at the Snorre B platform was shut down on 17 May following the discovery of an abnormal erosion of
Silver Tusk Oil completes operations on Willard Unit #1H-2 (Buda) wellMay 21, 2014Silver Tusk Oil Company, LLC Managing Member, Paul Fenemore, is pleased to announce that drilling operations on the Willard Unit
Circle Oil provides update on operations in MoroccoMay 20, 2014Circle Oil is pleased to announce the following operating update. The third drilling campaign in the Sebou permit and first campaign in the Lalla Mimouna
Frontier completes seismic data interpretation for Oman Block 38May 20, 2014Frontier Resources International has completed seismic data interpretation for onshore Block 38 in the Sultanate of Oman.
Leni's well GY-664 logged and cased to total depthMay 20, 2014LGO provides an update on its Goudron Field redevelopment activities in Trinidad. Well GY-664, the first of 30 planned development
Inpex, Santos get approval to explore Permit WA-502-P Offshore WAMay 20, 2014Inpex Corporation (Inpex ) reported that its subsidiary, Inpex Browse E&P Pty Ltd (Inpex Browse), has been granted Release Area
Gas2Grid's swabbing operations at the Malolos-1 well recoveries 100% oilMay 20, 2014Gas2Grid Limited is pleased to advise that swabbing operations at the Malolos-1 well have resulted in almost 100% oil recoveries but
Solo Oil provides update on Horse Hill investmentMay 19, 2014Solo Oil Plc announces that Angus Energy Limited (Angus Energy) as operator of the Horse Hill Prospect in the Weald Basin, has
Daybreak Oil and Gas continues success with ninth oil well in KentuckyMay 19, 2014Daybreak Oil and Gas, Inc. is pleased to announce the successful drilling of its ninth consecutive successful oil well at the Twin Bottoms
Bellatrix Exploration provides an operational updateMay 19, 2014Bellatrix Exploration Ltd. provide an operational update and updated 2014 guidance. The successful application of horizontal drilling and slick
Primeline Energy gets approval for LS36-1 gas field developmentMay 19, 2014Primeline Energy Holdings Inc. announced that the overall development programme for its LS36-1 gas field development (Development)
Karoon Gas Australia provides update on Poseidon North-1 Exploration wellMay 19, 2014Since the 17 April 2014 Poseidon North-1 Progress Report, 9-5/8' casing was run and cemented at 3,820 mRT. The 8-1/2' hole was
Calvalley Petroleum plans to initiate the drilling of the Ras Nowmah 7 appraisal wellMay 19, 2014Calvalley Petroleum Inc. provides the following operations update for shareholders. Late in the evening on May 7, 2014 the oil pipeline between Block 18
Pre-salt production sets new record, passing 470 thousand barrels of oil per dayMay 16, 2014Petrobras announces that oil production in the fields operated by the company, at the Pre-Salt Layer of the Santos and Campos basins
UMW Naga 5 drills Baragatan-1 well in SC 63May 16, 2014Nido Petroleum Limited reported on behalf of SC 63 Joint Venture partners PNOC-EC and Dragon Oil (SC 63 Philippines) Limited that