Scandoil  

Grand Gulf Energy provides S Welsh drilling update 2


Published Nov 27, 2012
[an error occurred while processing this directive]

Edit page New page Hide edit links

Grand Gulf Energy

The Board of Grand Gulf Energy advise that the Calloway #1 is presently drilling ahead at 6,000ft after setting casing at 2,500ft. The well will be drilled to the planned TD of 7,500ft.

The Company has a 10.5%WI in this low risk development project with an estimated resource of 450,000 bbls of oil.

The S Welsh project is located in Jeff Davis Parish, Louisiana on the SW flank of Welsh Field (90 MMBO & 100 BCFG).

The well is targeting Marg Tex sands 250ft updip to a well that produced 335,000 bbls of oil. Including the adjacent fault blocks, the Marg Tex sands have produced over 1,000,000 bbls of oil from 4 wells. The proposed well is the highest location relative to these wells.

The project was generated from 3D seismic, reservoir study and subsurface mapping and is an up-thrown 3-way trap. The sand deposition is uniform in the area with the downdip well logging a combined 150ft of sand over three sands. The potential net resources to Grand Gulf are estimated at 45,000 bbls of oil representing a low risk development project. Gross flow rates are estimated at 200-300 bbls oil per day. The net revenue interest is 75%.

Tags: Grand Gulf Energy




Advertisment:

Add a Comment to this Article

Please be civil. Job and promotion will not be added into the comment page.

(Use Markdown for formatting.)

This question helps prevent spam:

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us
Stats

 

sitemap xml