Gulfstream Services Inc (GSI) has successfully completed two six figure decommissioning contracts with major oil and gas service companies, Helix Well Ops UK and Dof Subsea.
The Helix contract was part of the BP North West Hutton decommissioning project where GSI tools were used to remove 10” and 20” pipelines from the seabed. GSI’s Hydraulic Shear was an effective engineering solution in the situation due to the quick boat to boat times.
GSI equipment was used by Dof Subsea for the cutting and recovering of items on a North Sea platform including a 6” pipeline, concrete mattresses, clump weights and various small steel structures. After the assignment it was reported that the performance of GSI equipment and personnel were above expectations and caused no downtime.
Both projects were carried out in the North Sea over a three and two week period respectively.
Tags:
Gulfstream Services Inc.
Add a Comment to this Article
Please be civil. Job and promotion will not be added into the comment page.