Scandoil  

Hydrocarbon flows at surface during davenport 1 testing


Published Aug 22, 2014
Strike Energy Limited-2

Strike Energy Limited has successfully completed the preliminary testing operations at Davenport 1 in PEL 94 (Beach Energy Limited 50% (Operator), STX 35% and Senex Energy Limited 15%.

Completion, flow back and testing operations at Davenport 1 commenced on 2 August 2014. A Patchawarra Vu coal zone was perforated and a small fracture stimulation treatment pumped.

Coil tubing operations, including nitrogen pumping, were then undertaken to clean the wellbore and to artificially lift fluid out of the well. Encouraging hydrocarbon shows were observed via gas detector at surface throughout the duration of the nitrogen lift operations and an estimated 90% of the frac fluid was recovered during the flow back period.

Tags: Strike Energy Limited




Advertisment:

Add a Comment to this Article

Please be civil. Job and promotion will not be added into the comment page.

(Use Markdown for formatting.)

This question helps prevent spam:

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us
Stats

 

sitemap xml