Scandoil  

Jubilant Energy spuds KPL-3E-1 well in the oil producing Kharsang field


Published Jun 25, 2013
[an error occurred while processing this directive]

Edit page New page Hide edit links

Jubilant Energy-2

Jubilant says that KPL-3E-1, the fifth well of the six well Phase-III-Extension development drilling campaign in the oil producing Kharsang Field, was spudded on 23 June 2013.

KPL-3E-1, located in the southern part of the field, is being drilled as an infill development well between KSG#55 and KSG#53 with the S-00 reservoir sand layer as primary objective and Q-00 and T-00 sand layers as secondary objectives. The well is planned to be deviated by approximately 766 metres to the south-west from the existing plinth of the well KSG#34 and will be drilled to a target depth of approximately 1,666 metres Measured Depth ("MD") and 1,450 metres True Vertical Depth ("TVD").

The fourth development well of the current campaign, KSG#68 (previously referred to as KPL-3E-2), which was spudded on 17 May 2013, was successfully drilled to a revised target depth of 1,510 metres MD and 1,328 metres TVD on 13 June 2013.

Tags: Jubilant Energy




Advertisment:

Add a Comment to this Article

Please be civil. Job and promotion will not be added into the comment page.

(Use Markdown for formatting.)

This question helps prevent spam:

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us
Stats

 

sitemap xml