Scandoil.com

Northern completes flow testing at Ottoland onshore Netherlands


Published Apr 20, 2009
[an error occurred while processing this directive]

Edit page New page Hide edit links

Northern Petroleum

Post hydraulic reservoir fracturing flow testing has been completed on the Ottoland 1 side track during a 14 day period. Without artificial lift, the well flowed oil and water at improved rates to the July 2007 tests, proving the fracturing programme to be a success.

These results will be analysed to establish the final parameters of the production installations which could include downhole pumping at possibly higher flow rates, depending upon a cost effective resolution of water disposal requirements

Northern has now completed well workovers for production and hydraulic fracturing of the reservoir at the Brakel and Wijk en Aalburg gas fields as well as the Ottoland oil field. Similar operations are scheduled for the Geesbrug and Grolloo gas field in the near future in preparation for placing all these five fields into production.

Tags: Northern Petroleum




   

Add a Comment to this Article

Please be civil. Job and promotion will not be added into the comment page.

(Use Markdown for formatting.)

This question helps prevent spam:

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us

 

sitemap xml


 

Home