Scandoil  

Oilex continues operations to demobilize rig at Cambay PSC


Published Jul 14, 2011
[an error occurred while processing this directive]

Edit page New page Hide edit links

Oilex provides drilling operations update

Oilex advised that operations are continuing to demobilize the Black Pearl rig and associated drilling equipment.

Mobilization of the equipment required to conduct the large volume multi-stage fracture stimulation of the Y Zone tight gas reservoir is near completion and rigging up is progressing. In total, 16 zones will be stimulated in 8 stages over the length of the horizontal section of the well bore (approximately 600 meters).

•Report date: July 12, 2011 •Status:

◦Demobilizing drilling rig ◦Mobilizing fracture stimulation equipment •Past Week's Operations Demobilizing drilling rig •Objective Cambay Eocene "tight" reservoir Y Zone •Total Depth (TD) 2,740 meters The participating interests in the Cambay PSC are:

•Oilex Ltd (Operator) 30% •Oilex NL Holdings (India) Limited 15% •Gujarat State Petroleum Corporation Ltd 55%

Tags: Oilex Ltd




Advertisment:

Add a Comment to this Article

Please be civil. Job and promotion will not be added into the comment page.

(Use Markdown for formatting.)

This question helps prevent spam:

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us

 

sitemap xml