Scandoil  

Oilex secures Essar rig for drilling Cambay-77H


Published Dec 3, 2013
Essar Rig 4

Oilex Ltd announce that the Cambay Joint Venture has secured the Essar Rig 4 ("Rig 4") for drilling Cambay-77H through Essar Oilfield Services Limited. Rig 4 is one of several rigs proposed as part of the competitive tendering process conducted by Oilex with support from its Joint Venture Partner, GSPC.

Rig 4 is currently located in Dubai and arrangements are being made by Essar to mobilise it to the Cambay-77H site. The estimated mobilisation time is 65 to 75 days with an anticipated well spud in mid Q1, 2014.

Cambay-77H is the second horizontal multi-stage fracture stimulated well in Cambay Field and has been designed with a 350 metre lateral section that will be fracture stimulated in four stages using the "plug and perf" methodology pioneered in North America. Each stage will have two fracture initiation points such that the lateral section of the well will have a total of eight fractures.

Tags: Oilex Ltd




Advertisment:

Add a Comment to this Article

Please be civil. Job and promotion will not be added into the comment page.

(Use Markdown for formatting.)

This question helps prevent spam:

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us
Stats

 

sitemap xml