Scandoil  

Otto to start abandonment operations at Duhat sidetrack


Published May 26, 2011
[an error occurred while processing this directive]

Edit page New page Hide edit links

Otto Energy Limited

Otto provided the following update on the progress of the Duhat-1A sidetrack well, located in the Philippines.

Since the last update, the well was drilled to 321 m TVD (True Vertical Depth) in the 12 ¼” section before becoming stuck, again due to unstable hole conditions (similar to those experienced in the Duhat-1 nearby well).

The well was subsequently plugged back to 200 m TVD and abandonment operations have commenced.

Information obtained during drilling from both Duhat-1 and the Duhat-1A sidetrack are very encouraging. In both wells, high general background gas levels have been observed during drilling, consistent with the presence of an oil generative area. These high gas levels, in formations of relatively weak rock strength coupled with unexpected shallow overpressure in the Miocene Tagnocot interval require further study prior to the recommencement of exploration in the block.

Drilling further ahead in Duhat-1A is now considered to be imprudent on safety grounds and abandonment is now in progress.

Otto Energy Ltd and its partners in SC-51 are excited by the geotechnical results of this initial drilling campaign and further work will be programmed once the data from recent operations have been fully analyzed.

Tags: Otto Energy Limited




Advertisment:

Add a Comment to this Article

Please be civil. Job and promotion will not be added into the comment page.

(Use Markdown for formatting.)

This question helps prevent spam:

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us

 

sitemap xml