Scandoil.com

Reece Energy to increase Saskatchewan production


Published Nov 15, 2007
[an error occurred while processing this directive]

Edit page New page Hide edit links

Reece Energy announces 2005 reserve evaluation-Spotlight

Reece Energy Exploration Corp.has completed drilling the first part of its fourth quarter drilling program, which consisted of 13 (8 net) gas wells, on November 4, 2007.

Utilizing a two-rig system Reece was able to drill all 13 wells quickly and at very low cost. The main-hole drilling part of the program was completed in 13 days and the field estimated average cost to drill and case each well is $110,000 (gross).

Reece drilled three (3 net) gas wells on its property at Greenan. Third party engineering field estimates show the extended absolute open flow test rate, for the first well tested, to be around 50e3m3/d (295 BOE/d).

"This was the well we were holding out as having the most risk and we're pleasantly surprised with the results," says Lorne Swalm President and C.E.O. of Reece. Actual production for this well may vary from test rates due to compression facility constraints. With the success of this well and the expected success of the rest of the drilling program, Reece has the ability to meet or exceed its year-end production target of 1,300 BOE/d. The other two Greenan wells will be evaluated over the coming weeks.

The remaining ten (5 net) wells were all cased and are being completed, evaluated and tied in. Information concerning the remaining wells will be released as results become available. Reece intends to have production from all wells on stream by the end of November.

In addition Reece has commenced the oil-drilling portion of its fourth quarter capital program. At Chandler Reece's operating partner has completed the first of two horizontal development wells in the Midale formation, and has moved to the second well. Reece holds a 7.5% gross over-riding royalty convertible to a 25% working interest after payout. The successful drilling of the current well will bring the number of producing wells to nine (2.75 net) at Chandler. Further to the drilling at Chandler Reece plans to drill or otherwise participate in four (2.16 net) additional light oil wells in other areas prior to the end of the fourth quarter.

Mr. Swalm adds, "The lion's share of our 2008 capital budget will be spent on developing our multiple light oil drilling opportunities in West Central and South Eastern Saskatchewan."

Tags: Reece Energy Exploration Corp.




   

Add a Comment to this Article

Please be civil. Job and promotion will not be added into the comment page.

(Use Markdown for formatting.)

This question helps prevent spam:

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us

 

sitemap xml


 

Home