Scandoil  

Solimar Energy provides Kreyenhagen drill update


Published Sep 20, 2013
[an error occurred while processing this directive]

Edit page New page Hide edit links

Solimar Energy Limited

Solimar Energy Limited has signed a drilling contract with Key Energy Services LLC to drill the second well (K 8-33) of the Phase I work program in the Kreyenhagen Heavy Oil Project.

The rig is expected to be moved to site today, and K 8-33 is expected to spud shortly thereafter. The well will be drilled on trend to the South-East of the Discovered Resource area. The well will be directionally drilled up to a 48 degree angle and is expected to convert additional resources from the Prospective to the Discovered category.

The first well (K 2-33) of the Phase 1 program was drilled to a total depth of 1,472 feet measured depth on July 20, 2013 and was subsequently logged and cased. The well was directionally drilled up to a 48 degree angle and encountered approximately 600 feet (measured depth) gross interval of the Temblor Sandstone.

Tags: Solimar Energy Limited




Advertisment:

Add a Comment to this Article

Please be civil. Job and promotion will not be added into the comment page.

(Use Markdown for formatting.)

This question helps prevent spam:

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us
Stats

 

sitemap xml