Strategic Oil & Gas Ltd. provide drilling results from the Keg River vertical well at Steen River.
KEG RIVER VERTICAL WELL: 100/15-22-122-21W5M
Strategic drilled its third successful Keg River Well in the North Marlowe oil pool at Steen River.
• Rate: The well has been on production for 11 days at stabilized test rates of between 225 to 250 BOEPD. IP30 is expected to exceed 200 BOEPD.
• Oil Cut: The well is producing 100% clean oil with associated solution gas.
• Pay: The well penetrated a dolomite zone with over 12 meters of net oil pay and is structurally the highest well in the pool.
• Pressure: The well tested close to virgin reservoir pressure.
• Pool: The well confirms the lateral extent of the oil pool and the porosity mapping derived from the 3D seismic.
• Cost: The well was drilled and completed for approximately $1.7million.
Strategic has a 100% working interest in the North Marlowe Keg River Pool and plans to drill three additional vertical Keg River wells in the first quarter of 2012.
Tags:
Strategic Oil & Gas Ltd.
Add a Comment to this Article
Please be civil. Job and promotion will not be added into the comment page.