Scandoil  

Target Energy provides Buffalo project update


Published May 11, 2011
[an error occurred while processing this directive]

Edit page New page Hide edit links

Target Energy Limited

US-focussed oil and gas exploration and production company, Target Energy Limited advises that work continues at its Buffalo Project in South Texas.

Following the 14 April fracture stimulation and the subsequent installation of a pump jack to accelerate the recovery of the load fluid, the well has now recovered approximately 70% of the load water (over 11,800 barrels of water were pumped into the formation during the operation).

Gas and traces of oil continue to be produced with the water. While still minor, the gas flow rate is now sufficient to be measurable and as such the Company is presently installing equipment to allow the produced oil and gas to be separated out from the recovered water and to commence measuring the relevant flow rates.

Tags: Target Energy




Advertisment:

Add a Comment to this Article

Please be civil. Job and promotion will not be added into the comment page.

(Use Markdown for formatting.)

This question helps prevent spam:

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us

 

sitemap xml